Track Record
EPCC PROJECT
NO | Client Name | Completion Date | Brief Description of Performed | List of Equipment Involved |
---|---|---|---|---|
1 | CTCI | Feb 2017 | Engineering, Procurement, Construction & Commissioning of HVAC System for RFCC, LTU, PRU Units For Rapid Project (Package 1). | AHU’s/ACCU’s, Blast Valves, Fire Damper, Shut – Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Exhaust Fan, Sound Attenuator, Control Panels & Etc. |
2 | SINOPEC | Feb 2017 | Engineering, Procurement, Construction & Commissioning of HVAC System for CDU, ARDS, & HCDU units For Rapid Project (Package 2). | AHU’s/ACCU’s, Blast Valves, Fire Damper, Shut – Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Exhaust Fan, Sound Attenuator, Control Panels & Etc. |
3 | MSET SHIPBUILDING CORPORATION SDN BHD | Jun 2014 | EPCC for supply and install new air conditioning Packages for 45 meter utility / personnel carrier (Hull No 5765 and 5768) | AHU’s, ACCU’s, VAV’s, BMS Control Panels (York Brand) |
4 | OFFSHORE INDUSTRIES SDN BHD | Apr 2014 | EPCC For HVAC Package for Tapis C Enhanced and Oil Recovery (EOR) Brownfield | AHU’s/ACCU’s Fire Damper, Shut – Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Filter Coalescer, Exhaust Fan, Sound Attenuator, Control Panels & Etc. |
5 | MSET SHIPBUILDING CORPORATION SDN BHD | Dec 2013 | EPCC for air conditioning & Mechanical Ventilation for 2 units 45 meter of personnel carrier (Hull No 5765 and 5768) | AHU’s / ACCU’s York Brand, fire damper, Shut-off damper, volume control damper, pressure relief damper, non-return damper, duct heater, filter coalesce, exhaust fan, sound attenuator, control panels & ducting servicing. |
6 | PETRONAS CARIGALI SDN BHD (SBO) | Nov 2013 | EPCC to supply and renew 2 unit Ex Proof Air Conditioning At Semarang Platform (SBO/2013/SRM/0017) | AHU’s, ACCU’s ( Indoor and Outdoor Units) and Ducting works |
7 | PETRONAS CARIGALI SDN BHD (SBO) | Nov 2013 | EPCC of HVAC System for PETRONAS Carigali Sdn Bhd (SBO/2013/SRM/0003) | AHU’s, ACCU’s, VAV’s, BMS Control Panels |
8 | COSMIC ACCORD | Mar 2013 | EPCC of new Air Conditioning and Ventilation Package for Lynas MCC Building | -AHU Filter – Blower – Outdoor unit -Condenser Motor -Purge, vacuum & refill gas R22 |
9 | MSET SHIPBUILDING CORPORATION SDN BHD | Dec 2012 | EPCC of Supply and Install New Air Conditioning Packages for 45 Meter Utility/ Personnel Carrier (Hull No 5766, 5767 and 5769) | AHU’s / ACCU’s York Brand, fire damper, Shut-off damper, volume control damper, pressure relief damper, non-return damper, duct heater, filter coalesce, exhaust fan, sound attenuator, control panels & ducting servicing. |
10 | SPA INTEGRATED SDN BHD | Apr 2011 | EPCC to supply and install new HVAC and Ventilation System at Kompleks Sukan OKU Kg. Pandan for Kementerian Belia dan Sukan Malaysia | AHU’s / ACCU’s York Brand, Fire Damper, Shut-Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Filter Coalesce, Exhaust Fan, Sound Attenuator, Control Panels & Ducting Servicing. |
11 | PERODUA SDN BHD | Oct 2010 | EPCC to rectify and install new HVAC and Ventilation | AHU’s / ACCU’s York Brand, Fire Damper, Shut-Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Filter Coalesce, Exhaust Fan, Sound Attenuator, Control Panels & Ducting Servicing. |
12 | PETRONAS EAST COAST REGIONAL OFFICE | Oct 2010 | EPCC to supply and install new HVAC and exhaust system at KDRP Rantau Petronas | AHU’s / ACCU’s York Brand, Fire Damper, Shut-Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Filter Coalesce, Exhaust Fan, Sound Attenuator, Control Panels & Ducting Servicing. |
13 | PASCA BINA SDN BHD | Dec 2009 | EPCC for upgrading HVAC systems for extension building BP Acetyls control room. | AHU’s, ACCU’s (indoor and outdoor units York) and Ducting works. |
14 | PETROFAC LTD | Dec 2009 | EPCC for additional HVAC system for UPS upgrading for MOPU vendor | -Washable AHU filter -Outdoor condenser fan motor 1.5Hp -Motor condensing fan |
15 | PETRONAS VCM | Oct 2009 | EPCC for minilab LEV system c/w DOSH approval | AHU’s / ACCU’s York Brand, Fire Damper, Shut-Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Filter Coalesce, Exhaust Fan, Sound Attenuator, Control Panels & Ducting Servicing. |
16 | PETRONAS POLYETHYLENE MALAYSIA | Feb 2009 | EPCC for Revamption of Central Laboratory Polyethylene & Ethylene Malaysia c/w DOSH approval | AHU’s, ACCU’s (indoor and outdoor units York) and Ducting works. |
17 | PETRONAS GAS BERHAD | Dec 2008 | Control Room A/cond AC chiller 110TR Replacement – 2nd | -AHU Filter -Blower -Outdoor unit -Condenser Motor -Purge, vacuum & refill gas R22 |
18 | PETRONAS GAS BERHAD | Oct 2008 | PR Laboratory A/cond AC chiller 110TR Replacement – 1st | AHU’s, ACCU’s (indoor and outdoor Units York) and Ducting works |
19 | BASF SERVICES (M) SDN BHD | Jul 2008 | The engineering, procurement, construction and completion of Waste Water Laboratory B139 | -Compressor -Motor Blower |
20 | TIOXIDE (MALAYSIA) SDN BHD | Apr 2008 | EPCC project of Package Water Chiller Unit of Tetra Dilution | -Washable AHU Filter -Outdoor Condenser fan motor 1.5Hp -Motor condensing fan |
21 | VACUUMSCHMELZE (M) SDN BHD | Mar 2008 | EPCC project for design for LEV System for Core, Varnish & Costing rooms. | AHU’s, ACCU’s, VAV’s, BMS Control Panels (York Brand) |
22 | VACUUMSCHMELZE (M) SDN BHD | Mar 2008 | Design, procurement, installation, testing and commissioning c/w DOE & DOSH registration for LEV & HVAC System | -AHU Filter -Blower -Outdoor unit -Condenser Motor -Purge, Vacuum & refill gas R22 |
23 | MAJLIS PERBANDARAN KUANTAN | Jan 2008 | EPPC for HVAC system Complex Budaya Cherating | AHU’s, ACCU’s, (indoor and outdoor units York) and Ducting Works |
24 | IMPIAN BUMIRIA SDN BHD | Jun 2007 | EPCC for Spot Cooling System for Batch Module & Bottle Line, Project Atlantis at FPG OLEOCHEMICALS, Kuantan | -Washable AHU Filter -Outdoor Condenser fan motor 1.5Hp -Motor Condensing Fan |
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) ENGINEERING
NO | Client Name | Start Date | Brief Description of work Performed | List of Equipment Involved |
---|---|---|---|---|
1 | Ocean Might Sdn Bhd | 10 NOV 2016 | ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) FOR BUNGA PAKMA A WELLHEAD RISER PLATFORM (BP-A WHRP) PROJECT | N/A |
2 | SINOPEC | 01 AUG 2016 | Engineering, Procurement, Construction & Commissioning of HVAC System for CDU, ARDS, & HCDU units For Rapid Project (Package 2) | N/A |
3 | CCSM | 17 FEB 2016 | Engineering, Procurement, Construction & Commissioning of HVAC System for RFCC, LTU, PRU Units For Rapid Project (Package 1). | N/A |
4 | TECHNIMONTHQC | 01 APR 2016 | P7 – EPCC POLYPROPYLENE UNITS: SPHERIPOL 3305/ SPHERIZONE 3315 FOR RAPID PROJECT | N/A |
5 | SAMSUNG ENGINEERING | 15 OCT 2016 | RAPID (Refinery & Petrochemicals Integrated Development) Package #11 EO/EG Project | N/A |
6 | MIE INDUSTRIAL | 24 JAN 2018 | RAPID (Refinery & Petrochemicals Integrated Development) Package #29 (C4 INA) | N/A |
7 | SIEMENS | 2 MAY 2018 | Mechanical Ventilation System – Phase 1E at RAPID Pengerang Project | N/A |
8 | MMHE | 1 MARCH 2019 | Supply and Installation of Air Conditioning and Mechanical Ventilation System (ACMV) for Dry Dock 3 | N/A |
9 | CTCI & MIE (CMI) | 10 JULY 2019 | RAPID PACKAGE P33 – EPCC OF RAPID EXCESS LP STEAM TURBINE GENERATOR PROJECT | N/A |
10 | MIE | 9 AUG 2019 | RAPID PACKAGE 29 C4 INA PROJECT | N/A |
11 | CTCI & MIE (CMI) | 28 FEB 2020 | PROVISION OF HVAC SYSTEM FOR PC MTBE FLARE FOR LNG TRUCK LOADING FACILITIES AT REGASIFICATION TERMINAL PENGERANG | N/A |
12 | SIEMENS | 01 JUNE 2020 | PDT2 – PENGERANG DEEPWATER TERMINAL (TWO) AT PENGERANG, JOHOR – MECHANICAL VENTILATION SYSTEM | N/A |
13 | MSET SHIPBUILDING CORPORATION SDN BHD | Jun 2014 | EPCC for supply and install new air conditioning Packages for 45 meter utility / personnel carrier (Hull No 5765 and 5768) | AHU’s, ACCU’s, VAV’s, BMS Control Panels (York Brand) |
14 | OFFSHORE INDUSTRIES SDN BHD | Apr 2014 | EPCC For HVAC Package for Tapis C Enchanced and Oil Recovery (EOR) Brownfield | AHU’s/ACCU’s Fire Damper, Shut – Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Filter Coalescer, Exhaust Fan, Sound Attenuator, Control Panels & Ducting Servicing. |
15 | MSET SHIPBUILDING CORPORATION SDN BHD | Dec 2013 | EPCC for air conditioning & Mechanical Ventilation for 2 units 45 meter of personnel carrier (Hull No 5765 and 5768) | AHU’s / ACCU’s York Brand, fire damper, Shut-off damper, volume control damper, pressure relief damper, non-return damper, duct heater, filter coalesce, exhaust fan, sound attenuator, control panels & ducting servicing. |
16 | PETRONAS CARIGALI SDN BHD (SBO) | Nov 2013 | EPCC to supply and renew 2 unit Ex Proof Air Conditioning At Semarang Platform (SBO/2013/SRM/0017) | AHU’s, ACCU’s ( Indoor and Outdoor Units) and Ducting works |
17 | PETRONAS CARIGALI SDN BHD (SBO) | Nov 2013 | EPCC of HVAC System for PETRONAS Carigali Sdn Bhd (SBO/2013/SRM/0003) | AHU’s, ACCU’s, VAV’s, BMS Control Panels |
18 | COSMIC ACCORD | Mar 2013 | EPCC of Supply and Install New Air Conditioning Packages for 45 Meter Utility/ Personnel Carrier (Hull No 5766, 5767 and 5769) | -AHU Filter -Blower -Outdoor unit -Condenser Motor -Purge, vacuum & refill gas R22 |
19 | MSET SHIPBUILDING CORPORATION SDN BHD | Dec 2012 | EPCC of Supply and Install New Air Conditioning Packages for 45 Meter Utility/ Personnel Carrier (Hull No 5766, 5767 and 5769) | AHU’s / ACCU’s York Brand, fire damper, Shut-off damper, volume control damper, pressure relief damper, non-return damper, duct heater, filter coalesce, exhaust fan, sound attenuator, control panels & ducting servicing. |
20 | SPA INTEGRATED SDN BHD | Apr 2011 | EPCC to supply and install new HVAC and Ventilation System at KompleksSukan OKU Kg. Pandan for KementerianBeliadanSukan Malaysia | AHU’s / ACCU’s York Brand, Fire Damper, Shut-Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Filter Coalesce, Exhaust Fan, Sound Attenuator, Control Panels & Ducting Servicing. |
21 | PERODUA SDN BHD | Oct 2010 | EPCC to rectify and install new HVAC and Ventilation | AHU’s / ACCU’s York Brand, Fire Damper, Shut-Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Filter Coalesce, Exhaust Fan, Sound Attenuator, Control Panels & Ducting Servicing. |
22 | PETRONAS EAST COAST REGIONAL OFFICE | Oct 2010 | EPCC to supply and install new HVAC and exhaust system at KDRP RantauPetronas | AHU’s / ACCU’s York Brand, Fire Damper, Shut-Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Filter Coalesce, Exhaust Fan, Sound Attenuator, Control Panels & Ducting Servicing. |
23 | PASCA BINA SDN BHD | Dec 2009 | EPCC for upgrading HVAC systems for extension building BP Acetyls control room. | AHU’s, ACCU’s (indoor and outdoor units York) and Ducting works. |
24 | PETROFAC LTD | Dec 2009 | EPCC for additional HVAC system for UPS upgrading for MOPU vendor | -Washable AHU filter -outdoor condenser fan motor 1.5Hp -Motor condensing fan |
25 | PETRONAS VCM | Oct 2009 | EPCC for minilab LEV system c/w DOSH approval | AHU’s / ACCU’s York Brand, Fire Damper, Shut-Off Damper, Volume Control Damper, Pressure Relief Damper, Non-Return Damper, Duct Heater, Filter Coalesce, Exhaust Fan, Sound Attenuator, Control Panels & Ducting Servicing. |
26 | PETRONAS POLYETHYLENE MALAYSIA | Feb 2009 | EPCC for Revamption of Central Laboratory Polyethylene & Ethylene Malaysia c/w DOSH approval | AHU’s, ACCU’s (indoor and outdoor units York) and Ducting works. |
27 | PETRONAS GAS BERHAD | Dec 2008 | Control Room A/cond AC chiller 110TR Replacement – 2nd | -AHU Filter -Blower -Outdoor unit -Condenser Motor -Purge, vacuum & refill gas R22 |
28 | PETRONAS GAS BERHAD | Oct 2008 | PR Laboratory A/cond AC chiller 110TR Replacement – 1st | AHU’s, ACCU’s (indoor and outdoor Units York) and Ducting works |
29 | BASF SERVICES (M) SDN BHD | Jul 2008 | The engineering, procurement, construction and completion of Waste Water Laboratory B139 | -Compressor -Motor Blower |
30 | TIOXIDE (MALAYSIA) SDN BHD | Apr 2008 | EPCC project of Package Water Chiller Unit of Tetra Dilution | -Washable AHU Filter -Outdoor Condenser fan motor 1.5Hp -Motor condensing fan |
31 | VACUUMSCHMELZE (M) SDN BHD | Mar 2008 | EPCC project for design for LEV System for Core, Varnish & Costing rooms. | AHU’s, ACCU’s, VAV’s, BMS Control Panels (York Brand) |
32 | VACUUMSCHMELZE (M) SDN BHD | Mar 2008 | Design, procurement, installation, testing and commissioning c/w DOE & DOSH registration for LEV & HVAC System | -AHU Filter -Blower -Outdoor unit -Condenser Motor -Purge, Vacuum & refill gas R22 |
33 | MAJLIS PERBANDARAN KUANTAN | Jan 2008 | EPPC for HVAC system Complex Budaya Cherating | AHU’s, ACCU’s, (indoor and outdoor units York) and Ducting Works |
34 | IMPIAN BUMIRIA SDN BHD | Jun 2007 | EPCC for Spot Cooling System for Batch Module & Bottle Line, Project Atlantis at FPG OLEOCHEMICALS, Kuantan | -Washable AHU Filter -Outdoor Condenser fan motor 1.5Hp -Motor Condensing Fan |